Wollongong · Planning guide

Concrete Cutting Safety Planning Checklist

Use this checklist to identify conversations and controls — not as a substitute for the provider's task-specific assessment.

Concrete cutting work zone with planned safety controls

Design and approval checks

Design and approval checks

Confirm who owns the design decision and whether the proposed cut affects a structural element, fire-rated assembly, waterproofing, services or another regulated system.

  • Approved cut location and dimensions
  • Engineering input where structural capacity may change
  • Service plans, scanning or locating appropriate to the task
  • Permits, inductions and site-controller approval

Work-zone and exposure checks

Work-zone and exposure checks

Plan how people, traffic, neighbouring work and sensitive equipment will be separated from noise, moving machinery, dust, slurry and falling or released material.

  • Exclusion zone and public interface
  • Silica dust control and respiratory requirements
  • Water supply, electrical protection and slurry capture
  • Ventilation, lighting and stable operator position
  • Noise, vibration and permitted work window

Cut-section and waste checks

Cut-section and waste checks

A cut piece can be heavy and unstable. Support, lifting, lowering, breaking, loading and disposal should be resolved before the final separation cut.

  • Estimated section dimensions and weight
  • Temporary support and lifting method
  • Travel path and load limits
  • Waste classification, containment and disposal responsibility

Official NSW references

Official NSW references

SafeWork NSW's code for cutting, drilling and grinding concrete and masonry products provides task-specific control information. The respirable crystalline silica code adds broader risk-management requirements. Use the current official versions for the actual workplace.

Safety planning questions

Safety planning questions

Does this checklist make the work safe to start?

No. It helps identify issues for the responsible parties and provider. The actual task needs a site-specific risk assessment and controls.

Who is responsible for hidden-service checks?

Responsibilities depend on the project and work arrangement, but they must be agreed before cutting. Never assume the saw operator can infer all services.

Can a cut piece be left unsupported until removal?

No general rule makes that safe. The support and removal sequence should be established before separation.

Start with Jackie

Turn this planning into an enquiry

Tell us what you need and Jackie will gather the key details from this guide. We then connect your enquiry with a vetted local concrete cutting provider who can follow up with you directly.

Open the chat to start your enquiry

Click below to open the conversation window and share your job details with Jackie.

Or call 0468 023 118